|
The Bureau of Reclamation has released
the Draft Environmental Assessment/Finding of No Significant Impact (EA/FONSI)
for the proposed 2-Gates Fish Protection Demonstration Project
(Demonstration Project) for public review. The document was developed in
accordance with the National Environmental Policy Act. Reclamation will
hold three public meetings to provide information on the proposed
Demonstration Project:
|
Fresno
|
Discovery Bay
|
Stockton
|
Monday
October 26, 2009
6:30-8:30 p.m.
Piccadilly Inn
2305 West Shaw Avenue
Map
|
Tuesday
October 27, 2009
6:30-8:30 p.m.
Discovery Bay Elementary School
1700 Willow Lake Road
Map
|
Wednesday,
October 28, 2009,
6:30-8:30 p.m.,
Stockton Scottish Rite
33 West Alpine Avenue
Map
|
The proposed Demonstration Project is a
5-year experiment to validate a new delta smelt behavioral model and
study the effects of modifying flows in the Sacramento-San Joaquin Delta
(Delta) to protect delta smelt and other sensitive aquatic species from
entrainment in Central Valley Project (CVP) and State Water Project (SWP)
export pumps. Research suggests that the pre-spawning migration of adult
delta smelt is tied to sediment/suspended particles in the water
(turbidity). Temporary gates would be placed across Old River and
Connection Slough in the central Delta and operated from December to
March to keep turbid water away from the CVP and SWP export pumps, thus
keeping adult delta smelt away from the pumps, and in March and June to
prevent larvae and juvenile delta smelt from being entrained by the
export pumps.
The Draft EA/FONSI is available at
http://www.usbr.gov/mp/nepa/nepa_projdetails.cfm?Project_ID=4472. If
you have problems accessing the document, please contact Public Affairs
at e-mail
mpPublicAffairs@usbr.gov or 916-978-5100. Additional information on
the Demonstration Project is available at
http://www.usbr.gov/mp/2gates/.
Comments are due by close of business
Tuesday, November 17, 2009, and should be sent to Mr. Mario Manzo,
Bureau of Reclamation, 2800 Cottage Way, MP-730, Sacramento, CA 95825,
or e-mailed to mmanzo@usbr.gov, or
faxed to 916-978-5094. For additional information or a copy of the Draft
EA/FONSI, please call 916-978-5060 (TDD 916-978-5608). To be added to
the Demonstration Project mailing list or if special assistance is
needed to attend a meeting, please contact Ms. Janet Sierzputowski at
916-978-5112 (TDD 916-978-5608) or e-mail
jsierzputowski@usbr.gov.
Contact:
Pete Lucero, 916-978-5100 |